A Construction Bill of Quantities (BOQ) is a structured document used to list construction work items, descriptions, units, quantities, rates and calculated amounts. It helps contractors, quantity surveyors, engineers and project managers prepare estimates, compare prices and control project costs.This guide explains the basic steps for preparing a construction BOQ, from reviewing drawings and measuring quantities to applying unit rates, preliminaries, overheads, contingencies and taxes.
What Is a Construction BOQ?
A Construction BOQ organizes construction work into clearly defined sections and measurable items. Each item normally includes a description of work, unit of measurement, quantity, unit rate and total amount. A well-prepared BOQ provides a consistent basis for estimating, tendering, cost comparison and project cost control.
Step 1: Review the Drawings and Specifications
Start by reviewing the latest architectural, structural, mechanical, electrical and other relevant drawings together with the project specifications. Confirm the project scope and identify all major work sections before taking quantities.Always use the latest approved drawings and record any assumptions where information is incomplete.
Step 2: Divide the Project into Work Sections
Organize the project into logical construction sections before measuring quantities. Typical BOQ sections may include preliminaries, earthworks, concrete, reinforcement, formwork, masonry, roofing, finishes, plumbing, electrical work and external works.Dividing the project into clear sections makes the BOQ easier to prepare, review, price and update.